Timesheet 2003:

Builder Name: Kevin Wilkerson   Project to date totals
Project: Rans S-6S Coyote II - Received kit on 12/10/2002  
E-mail: kevinw@perfhyd.com   Total Hours 2003: 389.00
Phone: (812) 479-7831   Carried Forward from 2002: 27.00
Other: (812) 455-7942 - Cell   Total Hours to Date: 416.00
January, February, March
Jan-03 Week 1 Work Area Week 2 Work Area Week 3 Work Area Week 4 Work Area Week 5 Work Area
Monday                    
Tuesday                    
Wednesday 2.00 Firewall Area 1.50 Elevator Push-Pull Tube Assy 3.50 Begin trim and fit interior sections        
Thursday                    
Friday 1.00 Rt Side FCF                
Saturday 2.50 Lt Side FCF/Ctrl Sticks     6.00 Complete interior fit, begin seat assembly        
Sunday 4.50 Ctrl Stick assy/Aileron Cable Assy                
Total weekly hours 10.00   1.50   9.50   0.00   0.00  
                     
Jan. total hours 21.00                  
                     
                     
Feb-03 Week 1 Work Area Week 2 Work Area Week 3 Work Area Week 4 Work Area Week 5 Work Area
Monday                    
Tuesday                    
Wednesday 1.00 Assemble Seat!                
Thursday                    
Friday                    
Saturday 3.50 Working on seats 6.00 Assemble tailwheel, gearlegs, wheels 6.00 Windshield deck, panel top covers, panel        
Sunday 3.00 Complete seats, disassemble interior     4.00 Finish panel cover closeouts, panel pre-fit        
Total weekly hours 7.50   6.00   10.00   0.00   0.00  
                     
Feb. total hours: 23.50                  
                     
                     
Mar-03 Week 1 Work Area Week 2 Work Area Week 3 Work Area Week 4 Work Area Week 5 Work Area
Monday                 1.50 Fabricate & install battery box
Tuesday         1.00 Remove panel top covers, reinstall windshield deck 1.50 Rt side door    
Wednesday        A1 1.50 Remove wheels & gear, lay out windshield 1.50 Rt side door    
Thursday                    
Friday                    
Saturday 3.00 Prefit, drill & install main gear. 4.00 Fit & Drill Axles, cut windshield deck 3.50 Finish trim deck, fit, drill & trim windshield, reinstall gear & wheels 3.50 Rt side door 4.00 Aft Baggage
Sunday             3.00 Lt side door    
Total weekly hours 3.00   4.00   6.00   9.50   5.50  
                     
Mar. total hours: 28.00                  
                     
April, May, June
Apr-03 Week 1 Work Area Week 2 Work Area Week 3 Work Area Week 4 Work Area Week 5 Work Area
Monday         7.00 Vertical Stabilizer 1.50 Elevator stops    
Tuesday                    
Wednesday 1.50 Begin trim, etc. on RH Bubble Door     4.50 Vert Stab, Rudder & Aft Baggage Door frame        
Thursday         8.00  Finish Aft Baggage, begin Horizontal Stabilizer        
Friday     1.00 Begin LH Door 4.00 Finish Horizontal Stabilizer, work on Elevators        
Saturday 5.00 Complete RH Bubble door installation 2.00 Complete LH Door drill, rivet, trim 4.50 Rudder Horn, Trim Tab 5.50 Rudder doubler, flaps and ailerons    
Sunday     1.00 Finish LH Door Assy 2.50 Install cables, elevator push/pull tube and yoke.        
Total weekly hours 6.50   4.00   30.50   7.00   0.00  
                     
Apr. total hours: 48.00                  
                     
                     
                     
May-03 Week 1 Work Area Week 2 Work Area Week 3 Work Area Week 4 Work Area Week 5 Work Area
Monday                 3.00 Drill & cleco right side rib clips
Tuesday     1.00 Pull parts for wings         1.50 Drill & cleco left side fwd rib clips
Wednesday         1.00 Internal brace tubes LH Wing 1.50 Pull parts for fuel tanks, drill fitting holes 1.00 Mark & locate aft rib clips left wing
Thursday     1.00 Drill & install hdwe L&R Forward spars 1.50 Aileron Push/Pull Tube guide, flap teleflex retainer L&R wings 2.50 Install fittings for fuel tanks 0.50 Drill & cleco aft rib clips left wing
Friday 3.00 Rearrange workspace         1.50 Air test fuel tank fittings    
Saturday     4.00 Drill & install hdwe front & rear spars 4.50 Aileron bell crank gussets, aileron bell crank, wing tip bows L&R wings 5.50 Fuel tanks, install hardware & tanks 3.50 Drill & cleco ALL topside ribs left wing
Sunday     1.50 Installing internal wing bracing tubes.     1.00 Begin rib clip installation    
Total weekly hours 3.00   7.50   7.00   12.00   9.50  
                     
May total hours: 39.00                  
                     
                     
                     
Jun-03 Week 1 Work Area Week 2 Work Area Week 3 Work Area Week 4 Work Area Week 5 Work Area
Monday                    
Tuesday                    
Wednesday                    
Thursday                    
Friday                    
Saturday 6.00 Drill & cleco balance of top and bottom ribs in L&R Wings 1.00 Install rib skin & channel on right side wing     8.00 Install rib channels, right side wing    
Sunday             3.00 Drill & Rivet Rib clips on right side wing    
Total weekly hours 6.00   1.00   0.00   11.00   0.00  
                     
June total hours: 18.00                  
                     
                     
July, August, September
Jul-03 Week 1 Work Area Week 2 Work Area Week 3 Work Area Week 4 Work Area Week 5 Work Area
Monday                    
Tuesday                    
Wednesday 2.00 Finish ribs on rt wing     1.00 Root skin left wing 1.00 Bond top aft rt wing    
Thursday         1.00 Antenna mount        
Friday 5.00 Install rib clips on lt wing 5.50 LE Wrap & Root Skin topside on right side wing            
Saturday 5.00 Drill & rivet rib ends and install leading edge wrap on lt wing 5.50 Rivet topside root skin, drill & cleco fuel scupper 6.50 Root skins top & bottom left wing 5.00 REBOND top aft rt wing skin, install braces, drill pitot & static holes    
Sunday         4.00 Bottom skin right wing, install antenna mount plate        
Total weekly hours 12.00   11.00   12.50   6.00   0.00  
                     
July total hours: 41.50                  
                     
                     
                     
Aug-03 Week 1 Work Area Week 2 Work Area Week 3 Work Area Week 4 Work Area Week 5 Work Area
Monday     2.00 Finish top & bottom rib drill & debur on right wing            
Tuesday                    
Wednesday                    
Thursday                    
Friday                    
Saturday 5.50 Remove root skins, install pitot & static system, install lt wing Nav/Strobe mount & wiring 7.00 Drill & debur left wing ribs top & bottom, install end for push pull tubes, intstall left aileron push pull tube, install flap lever assembly, teleflex cable, top and bottom cable retainers. 2.50 Rebond rt wing bottom aft and left wing top aft 4.50 Cover Left Horizontal Stab 4.50 Cover Right Horizontal Stab, cut fabric for elevators, rudder & 1 flap.
Sunday 4.50 Trim fuel tank neck, rt wing, install Nav/Strobe mount & wiring, drill top ribs rt wing     3.50 Cut fabric for wings, remove tail section components     5.50 Cover left & right elevators
Total weekly hours 10.00   9.00   6.00   4.50   10.00  
                     
Aug. total hours: 39.50                  
                     
                     
                     